Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Cci readerinstall header

Install Mounting Hardware

Cci readerinstall kit
KitID744
  1. Remove existing coin box and coin drop.

  2. Insert the C-0928 Mounting Bracket into the coin vault. Secure in place using the C-1059 Kep Nuts.

Connect Machine Interface Harness

Cci readerinstall kit
KitID627
KitDescPulse
  1. Connect the C-0126R1 Machine Start Harness to the Coin 1 connector on the Machine Control Assembly.
Cci readerinstall kit
KitID814
KitDescSerial
  1. Connect theC-0126-MLV Machine Start Harness to the RS-232 port on the Machine Control Assembly.
  2. Connect the C-5359 Machine Start Harnessto the Input 1port on the Machine Control Assembly.

Connect and Mount Reader

Multiexcerpt include
SpaceWithExcerptcom.atlassian.confluence.content.render.xhtml.model.resource.identifiers.SpaceResourceIdentifier@7627108f
MultiExcerptNameLC Reader
PageWithExcerpt_Reader Ports

  1. Feed remaining harness ends through mounting bracket.
  2. For serial setups:
    1. Connect the free end of the C-5359 Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.
    2. Connect the free end of the C-0126-MLV Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.
  3. For coin pulse setups:
    1. Connect the free end of the C-0126R1 Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.
  4. Connect the the Cat5 cables running to and from the adjacent machinesto ports labeled 3 (Line Connection Ports) as shown in the image above.
  5. Secure the LaundryCard reader to the bracket using included hardware.

Machine Configuration

TODO

Cci readerinstall footer