Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Cci readerinstall header

Install Mounting Hardware

Cci readerinstall kit
KitID980
  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to for further instructions.

Connect Power

Power is supplied through the same Machine Interface Harnessdescribed in step 4.

Connect Coin Sense Harness

Not applicable in this setup. FasCard reader does not collect payment from any other devices, and will only send funds to the machine's control.

Connect Machine Interface Harness

Cci readerinstall kit
KitID839
KitDescSerial
  1. Connect the C-6124-MDB Machine Start Harness to the MDB interface harness on the Machine Control Assembly.
    1. Optional: Use the pigtail MDB connector to reconnect any existing payment devices.

Connect and Mount Reader

Multiexcerpt include
SpaceWithExcerptCCIDOC
MultiExcerptNameF2 Reader
PageWithExcerpt_Reader Ports

  1. Feed remaining harness ends through the mounting hole as described in the F2: FasCard Reader Mounting Guide.
  2. Connect the black, 10-pin connection of the C-6124-MDB Machine Start Harness to port 5 (Serial Connection Port) as shown in the image above.
  3. Connect the clear, 3-pin connection of the C-6124-MDB Power Harness to port 1.
  4. Secure the FasCard reader to base as described in the FasCard Mounting Guide.
Cci readerinstall footer