Place the C-5700-TEMPDrill Template on the desired mounting location.
Verify included harnesses will reach desired location without encountering interference from internal machine components.
Refer to for further instructions.
Cci readerinstall kit
KitID
844
KitDesc
Card Only - Coin Ready
Remove existing coin box.
Disconnect harness connection from the Vault Switch. Connect both ends to theC-5365Bypass Harness.
Bend the side tabs of theC-6936 Vault Bracketoutward and install into the coin vault. The tabs should snap into place securing the bracket.
Attach the C-5414Mounting Bracket to the C-6936 Vault Bracket with C-0144Screws so it's secure against the machine panel.
Cci readerinstall kit
KitID
865
KitDesc
Card Only - Card Ready
Remove existing Alliance payment device bracket.
Install the C-6970Alliance Mounting Bracketinto the opening on the control panel for mounting card readers using the existing hardware.
Attach C-5414Mounting Bracket to the C-6970Alliance MountingBracket using the C-1060Screws.
Connect Power
Cci readerinstall kit
KitID
808
Connect theC-6204Power Adapter Harness (12VDC power) to the H10 connection on the Machine Control Assembly.
Secure the green wire beneath a chassis ground screw.
Connect Coin Sense Harness
Cci readerinstall kit
KitID
700
KitDesc
Coin Drop: Factory
Disconnect the Coin Drop from the Machine Control Assembly.
Connect the C-6250Coin Sense Harness to the harness connected to the Coin Drop.
Connect Machine Interface Harness
Cci readerinstall kit
KitID
582
KitDesc
Pulse and Serial
Connect the C-5240Machine Start Harness to the H3 connection on the Machine Control Assembly.
Optional: Stack Add-on Installation
Cci readerinstall kit
KitID
927
KitDesc
Pulse and Serial
Run C-5240-144 Machine Start Harness and C-6250-144 Coin Sense Harness to the second Machine Control Assembly.
Connect C-5240-144 Machine Start Harness to the H3 connection and the C-6250-144 Coin Sense Harness to the Coin 1connection on the second Machine Control Assembly.
Connect the C-6401 Stack Add-on Board to port 5 (Serial Connection Port) on the F2 reader.
Connect the Machine Start Harness connected to the upper pocket Machine Control Assembly to Unit 1 on the Stack Add-on Board.
Connect the Machine Start Harness connected to the lower pocket Machine Control Assembly to Unit 2 on the Stack Add-on Board.
Connect the Coin Sense Harness connected to the upper pocket Coin Drop to port 3 (Coin 1 Sense Harness Connection Port) on the F2 reader.
Connect the Coin Sense Harness connected to the lower pocket Coin Drop to port 4 (Coin 2 Sense Harness Connection Port) on the F2 reader.
Connect and Mount Reader
Multiexcerpt include
SpaceWithExcerpt
CCIDOC
MultiExcerptName
F2 Reader
PageWithExcerpt
_Reader Ports
Item No.
Component
Notes
1
Power Connection Port
Utilizes the same power harnesses as the first generation FasCard reader.
2
Pulse Connection Port
Connection point for pulse machine start harnesses.
3
Coin 1 Connection Port
This is the connection point for the harness input associated with Coin 1.
4
Coin 2 Connection Port
This is the connection point for the harness input associated with Coin 2.
5
Serial Connection Port
This is the connection point for serial machine start harnesses.
ACA machines using a serial configuration require dip switch 3 on theMachine Control Boardto be set to the 'ON' position.Leave all other dip switches as is.