_974
- David Bussman
Part #: C-5313
Desc 1: Terminal Block
Desc 2: for Laundrylux TD Dryers
Qty: 1
Part #: C-5356-144
Desc 1: Machine Start Harness
Desc 2: TD Pulse
Qty: 1
Part #: C-6400
Desc 1: Stack Add On Board - SLV
Desc 2: Pulse / SingleVend
Qty: 1
Part #: C-0941
Desc 1: Vault Cover
Desc 2: 3-7/8" x 3-1/2"
Qty: 1
Part #: C-0907
Desc 1: Drop Cover
Desc 2: Wascomat TD 3030
Qty: 1
Part #: C-1062
Desc 1: Nut
Desc 2: 4-40 - Kep
Qty: 4
Part #: C-0136
Desc 1: Screw
Desc 2: 4-40 1/2" pan head zinc
Qty: 4
The following steps assume a start harness is already connected to the upper pocket control.
Attach the C-5313 Terminal Block to the Machine Control Assembly for the lower pocket.
Run the C-5356-144 Machine Start Harness to the lower pocket Machine Control Assembly.
Connect the C-5356-144 Machine Start Harness to Positions 2 and 3 on the C-5313 Terminal Block.
Connect the C-6400 Stack Add-on Board to port 5 (Serial Connection Port) on the card reader.
Connect the white, 6-pin connector from the C-5356-144 Machine Start Harness to the J1 connection on the C-6400 Stack Add-On Board.
Insert the C-0941 Vault Cover into the coin vault for the lower pocket’s control.
Install the C-0907 Coin Drop Cover using the (4) C-0136 4-40 1/2” Pan Screws and (4) C-1062 4-40 Kep Nuts to secure in place.