0001 LaundryCard Reader Install Guide

Warning!

This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses.

It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.

Overview

Equipment Details

Type: Tumble Dryer (Stack)
Manufacturer: ADC
Make: ADC
Model Length: 5 to 6

If machine has larger non-standard coin drop, substitute drop cover C-0963 and label C-0031.

Associated Models


AD330
AD330D
ADC330
ADG330
ADG330D
ADS330

Recommended Tools and Supplies

  • Drill

  • 1 1/8" Tungsten Carbide Tipped Hole Cutter

  • Cutting Oil

  • 9/64" Drill Bit

  • Center Punch

  • Hammer

  • Fine Point Permanent Marker

  • Pliers

  • Tape Measure

Installation

Install Mounting Hardware

 I-M0041

Part #: C-0015

Desc 1: Label

Desc 2: Reader Cover Label

   Qty: 1

Part #: C-0032

Desc 1: Label

Desc 2: ADC Coin Drop

   Qty: 1

Part #: C-0133

Desc 1: Standoff

Desc 2: 8-32" x 1-1/2" - Hex

   Qty: 2

Part #: C-0141

Desc 1: Screw

Desc 2: 8-32 x 1-1/2" - Cap

   Qty: 2

Part #: C-0925A

Desc 1: Mounting Bracket

Desc 2: For Coin Vault Mounting

   Qty: 1

Part #: C-0925B

Desc 1: Mounting Bracket

Desc 2: For Coin Vault Mounting

   Qty: 1

Part #: C-0926

Desc 1: Drop Cover

Desc 2: American 330

   Qty: 1

Part #: C-1044N

Desc 1: Nut

Desc 2: M3 - Kep

   Qty: 4

  1. Remove existing coin box and coin drop.

  2. Insert the C-0925A Mounting Bracket into the Coin Vault. Orient the Mounting Bracket so that the threaded studs face outward.

  3. Attach the C-0133 Standoffs to the threaded studs on the Mounting Bracket.

  4. Place C-0925B Mounting Bracket Cover over the Coin Vault so that the opening for the screws line up with the Standoffs.

  5. Once the Machine Start Harness and the Ethernet Cables are ran through the rectangular opening in the brackets, secure the brackets in place by inserting the reader and attaching with C-0141 Screws.

  6. Insert C-0926 Drop Cover into the coin drop opening. Secure in place using C-1044N Kep Nuts.

  7. Apply C-0032 Coin Drop Label to the front of the Drop Cover.

 I-M0043

Part #: C-0015

Desc 1: Label

Desc 2: Reader Cover Label

   Qty: 1

Part #: C-0141

Desc 1: Screw

Desc 2: 8-32 x 1-1/2" - Cap

   Qty: 2

  1. CCI Ready Machines will already have the proper mounting and will only need to be secured to the machine using the C-0141 Screws. 

Connect Machine Interface Harness

 I-T0024

Part #: C-0118

Desc 1: Machine Start Harness

Desc 2: ADC Phase 5

   Qty: 1

  1. Connect the C-0118 Machine Start Harness to the connector on the Machine Control Assembly.

 I-T0026

Part #: C-0118R1

Desc 1: Machine Start Harness

Desc 2: ADC Phase 7

   Qty: 1

  1. Connect the C-0118R1 Machine Start Harness to the connector on the Machine Control Assembly.

Connect and Mount Reader

 

  1. Feed remaining harness ends through mounting bracket.

  2. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  3. Connect the the Cat5 cables running to and from the adjacent machines to ports labeled 3 (Line Connection Ports) as shown in the image above.

  4. Secure the LaundryCard reader to the bracket using included hardware.

Machine Configuration

TODO