Cci readerinstall header

Install Mounting Hardware

Cci readerinstall kit
KitID584
KitDescCoin and Card
  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to for further instructions.

Cci readerinstall kit
KitID982
KitDescCard Only
  1. Disconnect wires connected to vault service switch and bridge connection using C-5365 Bypass Harness.
  2. Remove the four (4) T25 screws indicated below:

  3. Pull panel away from machine exposing the factory plate / Coin Drop
  4. Loosen the two (2) left retaining screws (Green) and remove the remaining screws on the bracket (Blue) and slide the bracket off the machine.
  5. Slide the C-6965 QT Mounting Bracket onto the loose screws and tighten. Add remaining screws to the corresponding holes on the bracket and tighten.

  6. Re-secure the front panel to the machine.
  7. Attach the C-5414 Reader Bracket to the C-6965 QT Mounting Bracket using C-5702 Chase Nipple and C-5703 Nut.

  8. Feed all reader harnesses through the center hole.

Connect Power

Cci readerinstall kit
KitID581
  1. Connect the C-6204-40 Power Adapter Harnessto the H10 connection on the machine control board.

  2. Secure the green wire beneath the ground screw.

  3. Connect the opposite end of the C-6204-40 Power Adapter Harness (3-pin molex) into the back of the F1 Reader.

Connect Coin Sense Harness

Cci readerinstall kit
KitID700
KitDescCoin Drop: Factory
  1. Disconnect the Coin Drop from the Machine Control Assembly.
  2. Connect the C-6250 Coin Sense Harness to the harness connected to the Coin Drop.

Connect Machine Interface Harness

Cci readerinstall kit
KitID582
KitDescSerial or Pulse
  1. Connect the C-5240 Machine Start Harness to the H3 connector on the Machine Control Assembly.

Connect and Mount Reader

Multiexcerpt include
SpaceWithExcerptcom.atlassian.confluence.content.render.xhtml.model.resource.identifiers.SpaceResourceIdentifier@7627108f
MultiExcerptNameF2 Reader
PageWithExcerpt_Reader Ports

Item No.ComponentNotes
1Power Connection PortUtilizes the same power harnesses as the first generation FasCard reader.
2Pulse Connection PortConnection point for pulse machine start harnesses.
3Coin 1 Connection PortThis is the connection point for the harness input associated with Coin 1.
4Coin 2 Connection PortThis is the connection point for the harness input associated with Coin 2.
5Serial Connection PortThis is the connection point for serial machine start harnesses.
  1. Feed remaining harness ends through the mounting hole as described in the Touchscreen Reader Mounting Guide (F2 & F3).
  2. Connect the free end of the C-5240 Machine Start Harness to port 5 (Serial Connection Port) as shown in the image above.
  3. Connect the free end of the C-6250 Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.
  4. Connect the free end of the C-6204-40 Power Harness to port 1.
  5. Secure the FasCard reader to base as described in the Touchscreen Reader Mounting Guide (F2 & F3).

Machine Configuration

TODO

Cci readerinstall footer