Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Cci readerinstall header

Install Mounting Hardware

Cci readerinstall kit
KitID771
KitDescCoin Ready
  1. Remove existing coin box and coin drop.

  2. Apply C-0033 Label over coin drop opening.
  3. Disconnect harness connection from the Vault Switch. Connect both ends to theC-5365 Bypass Harness.
  4. Bend the side tabs of theC-0936Bracketoutward and install into the coin vault. The tabs should snap into place securing the bracket.

  5. Attach theC-0133Standoffsto theBracket.

Cci readerinstall kit
KitID768
KitDescCard Only - Card Ready
  1. Remove existing Alliance payment device bracket.
  2. Install the C-0970R1Alliance Mounting Bracketinto the opening on the control panel for mounting card readers using the existing hardware.

Connect Machine Interface Harness

Cci readerinstall kit
KitID599
KitDescPulse
  1. Connect the C-0109R1 Machine Start Harness to the Coin 1 connector on the Machine Control Assembly.
Cci readerinstall kit
KitID582
KitDescSerial
  1. Connect the C-5240 Machine Start Harness to the H3 connector on the Machine Control Assembly.

Connect and Mount Reader

Multiexcerpt include
SpaceWithExcerptcom.atlassian.confluence.content.render.xhtml.model.resource.identifiers.SpaceResourceIdentifier@7627108f
MultiExcerptNameLC Reader
PageWithExcerpt_Reader Ports

  1. Feed remaining harness ends through mounting bracket.
  2. Connect the free end of the Machine Start Harness:
    1. If following steps for a serial Machine Start Harnessto port 1 (Serial Connection Port) as shown in the image above.
    2. If following steps for a pulse Machine Start Harnessto port 2 (Pulse Connection Port) as shown in the image above.
  3. Connect the the Cat5 cables running to and from the adjacent machinesto ports labeled 3 (Line Connection Ports) as shown in the image above.
  4. Secure the LaundryCard reader to the bracket using included hardware.

Machine Configuration

TODO

Cci readerinstall footer