Skip to end of banner
Go to start of banner

0262 Reader Install Guide

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Warning!

This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses.

It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.

Overview

Equipment Details

Type: Front Load Washer
Manufacturer: Maytag
Make: Maytag
Model Length: Not Set

Associated Models


MHN30PDAWW
MHN30PDBWW
MHN30PDC
MHN30PDCWW
MHN30PRBWW
MHN30PRCWW

Recommended Tools and Supplies

  • Drill

  • 1 1/8" Tungsten Carbide Tipped Hole Cutter

  • Cutting Oil

  • 9/64" Drill Bit

  • Center Punch

  • Hammer

  • Fine Point Permanent Marker

  • Pliers

  • Tape Measure

Installation

Install Mounting Hardware

 I-M0009

Part #: C-0141

Desc 1: Screw

Desc 2: 8-32 x 1-1/2" - Cap

   Qty: 2

Part #: C-0301

Desc 1: Topload Mounting Bolt

Desc 2:

   Qty: 1

Part #: C-0911

Desc 1: Metercase Bracket

Desc 2: Whirlpool - White

   Qty: 1

Part #: C-0015

Desc 1: Label

Desc 2: Reader Cover Label

   Qty: 1

  1. Remove existing coin box and coin drop.

  2. Insert C-0911 Metercase Bracket into the metercase and secure using the C-0301 Topload Mounting Bolt.

  3. Attach reader to C-0911 Metercase Bracket using C-0141 Screws once all harnesses are connected.

  4. Cover mounting screw holes using C-0015 Cover Label.

 I-M0003

Part #: C-6801

Desc 1: F2/F3 Reader Mounting Kit

Desc 2: Universal

   Qty: 1

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to FasCard Mounting Guide for further instructions.

 I-M0136

Part #: C-6801

Desc 1: F2/F3 Reader Mounting Kit

Desc 2: Universal

   Qty: 1

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to FasCard Mounting Guide for further instructions.

 I-M0122

Part #: C-0303

Desc 1: Topload Mounting Bolt

Desc 2:

   Qty: 1

Part #: C-6911

Desc 1: F2 Metercase Bracket

Desc 2: Whirlpool - White

   Qty: 1

Part #: C-5420

Desc 1: Screw

Desc 2: 10-32 x ¼" - Pan

   Qty: 2

Part #: C-5416

Desc 1: Screw

Desc 2: 8-32" x 3/8" - Button - Torx

   Qty: 2

Part #: C-5414

Desc 1: F2/F3 Std. Mounting Bracket

Desc 2: Sheet metal base

   Qty: 1

  1. Remove existing coin box and coin drop.

  2. Run reader harnesses through the metercase and out the opening where the coin mechanism was mounted.

  3. Attach the C-5414 Reader Bracket to the C-6911 Metercase Bracket using (2) C-5420 10-32 x 1/4 Pan Screws.

  4. Run reader harnesses through the circular opening in the C-6911 Metercase Bracket.

  5. Insert C-6911 Metercase Bracket into the metercase and secure using the C-0303 Topload Mounting Bolt.

Connect Power

 I-P0003

Part #: C-5101

Desc 1: Spade Taps

Desc 2: 18-14 AWG

   Qty: 3

Part #: C-5210

Desc 1: Power Adapter Harness

Desc 2: CGI

   Qty: 1

Part #: C-5500

Desc 1: Power Extension Harness

Desc 2: 25.5"

   Qty: 1

Part #: C-5602R1

Desc 1: Power Converter

Desc 2: SMT-012-018VW

   Qty: 1

  1. Tap power as described in the Fascard Reader Install - Universal Concepts document using the C-5101 Spade Taps provided.

  2. Connect the C-5210 Power Adapter Harness to the installed spade taps.

  3. Connect the C-5210 Power Adapter Harness to the C-5602 Power Converter.

  4. Connect the C-5500 Power Extension Harness to the appropriate connector on the C-5602 Power Converter. The remaining cable end connects to the FasCard reader.

  5. Connect the opposite end of the C-5210 Power Adapter Harness to the C-5602 Power Converter.

  6. Connect the C-5500 Power Extension Harness to the appropriate connector on the C-5602 Power Converter. The remaining cable end connects to the FasCard reader.

Connect Coin Sense Harness

 I-S0048

Part #: C-6362

Desc 1: Coin Sense Harness

Desc 2: MLG

   Qty: 1

  1. Disconnect the Coin Drop from the Machine Control Assembly.

  2. Connect the C-6362 Coin Sense Harness to the harness connected to the Coin Drop.

Connect Machine Interface Harness

 I-T0090

Part #: C-5364

Desc 1: Machine Start Harness

Desc 2: Maytag MFR

   Qty: 1

Part #: C-0126-MLV-EXT15

Desc 1: Extension Harness

Desc 2: Compass

   Qty: 1

  1. Connect the C-5364 Machine Start Harness to the Debit/AA3 connector on the Machine Control Assembly.

    1. If needed, use the C-126-MLV-EXT15 Extension Harness to extended the reach of the harness.

Connect and Mount Reader

 LaundryCard Reader (C-0100, C-0101, C-0102, C-0103)

  1. Feed remaining harness ends through mounting bracket.

  2. For serial setups:

    1. Connect the free end of the Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.

    2. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  3. For coin pulse setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the the Cat5 cables running to and from the adjacent machines to ports labeled 3 (Line Connection Ports) as shown in the image above.

  5. Secure the LaundryCard reader to the bracketry using included hardware.

 LaundryCard L2 Reader (C-0103-L2)

L2_Port_Guide.png
  1. Feed remaining harness ends through mounting bracket.

  2. For serial setups:

    1. Connect the free end of the Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.

    2. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  3. For coin pulse setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the free end of the Power Harness to port 1.

  5. Secure the L2 reader to base as described in FasCard F2/F3 Reader Installation Guide - Front Mount.

 F1 Reader (C-5001)

  1. Feed remaining harness ends through the mounting hole as described in the F1 Reader Mounting Guide.

  2. Connect the free end of the Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.

  3. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the free end of the Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.

  5. Connect the free end of the Power Extension Harness to port 4 (Power Harness Connection Port) as shown in the image above.

  6. Secure the FasCard reader to base as described in the F1 Reader Mounting Guide.

 F2/FLEX Reader (C-5401, C-5402, C-5402E)

  1. Feed remaining harness ends through the mounting hole as described in FasCard F2/F3 Reader Installation Guide - Front Mount.

  2. For Serial Setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

    2. Connect the free end of the Machine Start Harness to port 5 (Serial Connection Port) as shown in the image above.

  3. For Pulse Setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the free end of the Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.

    1. For dual coin drop setups connect the secondary Coin Sense Harness to port 4 (Coin Sense Harness Connection Port) as shown in the image above.

  5. Connect the free end of the Power Harness to port 1.

  6. Secure the FasCard reader to base as described in FasCard F2/F3 Reader Installation Guide - Front Mount.

 F3 Reader (C-5520, C-5520E)

TODO

Machine Configuration

MayTag AA3/Debit Connection Payment Pulse

  1. Enter Service Mode by activating the service switch.

  2. Locate Coin/Debit Option (J.) and set to Cd.

  • No labels