Skip to end of banner
Go to start of banner

0466 Reader Install Guide

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Warning!

This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses.

It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.

Overview

Equipment Details

Type: Tumble Dryer (Single)
Manufacturer: Alliance
Make: [VARIES]
Model Length: Not Set

Associated Models


JT30XGEC
JT30XGECL0005
JT30XGECN0037
JT30XGMC
JT50CGCDL0004
ST30XGEC
ST30XGMC

Recommended Tools and Supplies

  • Drill

  • 1 1/8" Tungsten Carbide Tipped Hole Cutter

  • Cutting Oil

  • 9/64" Drill Bit

  • Center Punch

  • Hammer

  • Fine Point Permanent Marker

  • Pliers

  • Tape Measure

Installation

Install Mounting Hardware

 I-M0104

Part #: C-5710

Desc 1: Rubber Grommet

Desc 2: 3/4"

   Qty: 1

Part #: C-6801

Desc 1: F2/F3 Reader Mounting Kit

Desc 2: Universal

   Qty: 1

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to FasCard Mounting Guide for further instructions.

 I-M0118

Part #: C-0144

Desc 1: Screw

Desc 2: 8-32 x 2" - Flat

   Qty: 2

Part #: C-5365

Desc 1: Bypass Harness

Desc 2: Alliance Coin Vault Bypass

   Qty: 1

Part #: C-5710

Desc 1: Rubber Grommet

Desc 2: 3/4"

   Qty: 1

Part #: C-6801

Desc 1: F2/F3 Reader Mounting Kit

Desc 2: Universal

   Qty: 1

Part #: C-6936

Desc 1: F2, Sm Vault Mount Bracket

Desc 2:

   Qty: 1

Part #: C-5033

Desc 1: Label

Desc 2: 4-5/8" x 3-1/2"

   Qty: 1

  1. Remove existing coin box.

  2. Install the C-5365 Bypass Harness by removing the coin vault switch and connecting the spade terminal connections to C-5365 Bypass Harness.

  3. Bend the side tabs of the C-6936 Bracket outward and install into the coin vault. The tabs should snap into place securing the bracket.

  4. Attach the C-5414 F2 Mounting Bracket to the Coin Vault Bracket using C-0144 screws.

Connect Power

 I-P0008

Part #: C-5101

Desc 1: Spade Taps

Desc 2: 18-14 AWG

   Qty: 3

Part #: C-5210

Desc 1: Power Adapter Harness

Desc 2: CGI

   Qty: 1

Part #: C-5500-84

Desc 1: Power Extension Harness

Desc 2: 84"

   Qty: 1

Part #: C-5602R1

Desc 1: Power Converter

Desc 2: SMT-012-018VW

   Qty: 1

  1. Tap power as described in the Fascard Reader Install - Universal Concepts document using the C-5101 Spade Taps provided.

  2. Connect the opposite end of the C-5210 Power Adapter Harness to the C-5602 Power Converter.

  3. Connect the C-5500-84 Power Extension Harness to the appropriate connector on the C-5602 Power Converter. The remaining cable end connects to the FasCard reader.

Connect Coin Sense Harness

 I-S0027

Part #: C-6250

Desc 1: Coin Sense Harness

Desc 2: F2

   Qty: 1

  1. Disconnect the Coin Drop from the Machine Control Assembly.

  2. Connect the C-6250 Coin Sense Harness to the harness connected to the Coin Drop.

 I-S0031

Part #: C-6253

Desc 1: Coin Sense Harness

Desc 2: 28"

   Qty: 1

  1. Disconnect the Coin Drop from the Machine Control Assembly.

  2. Connect the C-6253 Coin Sense Harness to the micro switch on the Coin Drop.

Connect Machine Interface Harness

 I-T0049

Part #: C-5300-NC

Desc 1: Machine Start Harness

Desc 2: Aliiance - Normally Closed

   Qty: 1

  1. Connect the C-5300-NC Machine Start Harness to the Coin 1 harness connected to the Machine Control Assembly.

Connect and Mount Reader

Item No.

Component

Notes

1

Power Connection Port

Utilizes the same power harnesses as the first generation FasCard reader.

2

Pulse Connection Port

Connection point for pulse machine start harnesses.

3

Coin 1 Connection Port

This is the connection point for the harness input associated with Coin 1.

4

Coin 2 Connection Port

This is the connection point for the harness input associated with Coin 2.

5

Serial Connection Port

This is the connection point for serial machine start harnesses.

  1. Feed remaining harness ends through the mounting hole as described in the F2/F3: FasCard Reader Mounting Guide.

  2. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  3. Connect the free end of the Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.

  4. Connect the free end of the Power Harness to port 1.

  5. Secure the FasCard reader to base as described in the FasCard Mounting Guide.

Machine Configuration

TODO

  • No labels