Warning!
This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses.
It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.
Overview
Equipment Details
Type: Front Load Washer
Manufacturer: Maytag
Make: Maytag
Model Length: 10
Associated Models
MAH22PDAWW
MAH22PDBWW
Recommended Tools and Supplies
Drill
1 1/8" Tungsten Carbide Tipped Hole Cutter
Cutting Oil
9/64" Drill Bit
Center Punch
Hammer
Fine Point Permanent Marker
Pliers
Tape Measure
Installation
Install Mounting Hardware
Connect Power
Connect Machine Interface Harness
Connect and Mount Reader
- Feed remaining harness ends through the mounting hole.
- Connect the free end of the C-5364 Machine Start Harness to port 5 (Serial Connection Port) as shown in the image above.
- Connect the free end of the C-5500 Power Extension Harness to port 1 (Power Harness Connection Port) as shown in the image above.
Machine Configuration
Enter Service Mode by activating the service switch. Locate Coin/Debit Option (J.) and set to Cd.MayTag AA3/Debit Connection Payment Pulse
CCI Software Configuration
Machine Control | Pulse | Serial |
---|---|---|
Gen2 | SingleVend (Relay) / 24ms | *NOT SUPPORTED* |
Additional Resources
- How to Program Address on a FasCard Reader
- FasCard Admin Site - Equipment Setup
- FasCard Admin Site - Machine Setup
- FasCard Admin Site - Pricing & Features Schedule
- F1 Reader Mounting Guide
- FasCard F2/F3 Reader Installation Guide - Front Mount
- FasCard Installation Videos
- FasCard Kit Installations - Machine Configurations & Related Documents