Skip to end of banner
Go to start of banner

_1163

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

 I-X0034

Part #: C-0940

Desc 1: Vault Cover

Desc 2: 3-7/8" x 2-3/4"

   Qty: 1

Part #: C-5356-144

Desc 1: Machine Start Harness

Desc 2: TD Pulse

   Qty: 1

Part #: C-6410

Desc 1: F3, SLV Stack Add On Dongle

Desc 2: Pulse / SingleVend

   Qty: 1

Part #: C-0907

Desc 1: Drop Cover

Desc 2: Wascomat TD 3030

   Qty: 1

Part #: C-1062

Desc 1: Nut

Desc 2: 4-40 - Kep

   Qty: 4

Part #: C-0136

Desc 1: Screw

Desc 2: 4-40 1/2" pan head zinc

   Qty: 4

The following steps assume a start harness is already connected to the upper pocket control.

  1. Locate area to mount C-6410 Pulse Stack Add-On Board.

    1. Must be close enough to reader mounting location to connect the harness to.

    2. Must be on a surface that does not received direct exposure from any heating elements (If applicable.)

  2. Clean mounting location to remove any dust and residue if needed.

  3. Remove the sticker from the back of the C-6410 Pulse Stack Add-On Board to expose the adhesive and apply to the mounting location.

  4. Attach the C-5313 Terminal Block to the Machine Control Assembly for the lower pocket.

  5. Connect the C-5356-144 Machine Start Harness to Positions 2 and 3 on the C-5313 Terminal Block.

  6. Connect the white, 6-pin connector from the C-5356-144 Machine Start Harness to the J1 connection on the C-6410 Pulse Stack Add-On Board.

  7. Insert the C-0940 Vault Cover into the coin vault for the lower pocket’s control.

  8. Apply the C-5035 Label over the coin drop opening for the lower pocket control.

  • No labels