Skip to end of banner
Go to start of banner

0016 Reader Install Guide

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Warning!

This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses.

It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.

Overview

Equipment Details

Type: Tumble Dryer (Stack)
Manufacturer: ADC
Make: ADC
Model Length: Not Set

Associated Models


AD235
ADG235
ADG235D

Recommended Tools and Supplies

  • Drill

  • 1 1/8" Tungsten Carbide Tipped Hole Cutter

  • Cutting Oil

  • 9/64" Drill Bit

  • Center Punch

  • Hammer

  • Fine Point Permanent Marker

  • Pliers

  • Tape Measure

Installation

Install Mounting Hardware

 I-M0010

Part #: C-5801

Desc 1: F1 Reader Mounting Kit

Desc 2: Front

   Qty: 1

  1. Place the C-5700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to FasCard Mounting Guide for further instructions.

 I-M0104

Part #: C-5710

Desc 1: Rubber Grommet

Desc 2: 3/4"

   Qty: 1

Part #: C-6801

Desc 1: F2/F3 Reader Mounting Kit

Desc 2: Universal

   Qty: 1

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to FasCard Mounting Guide for further instructions.

Connect Power

 I-P0003

Part #: C-5101

Desc 1: Spade Taps

Desc 2: 18-14 AWG

   Qty: 3

Part #: C-5210

Desc 1: Power Adapter Harness

Desc 2: CGI

   Qty: 1

Part #: C-5500

Desc 1: Power Extension Harness

Desc 2: 25.5"

   Qty: 1

Part #: C-5602R1

Desc 1: Power Converter

Desc 2: SMT-012-018VW

   Qty: 1

  1. Tap power as described in the Fascard Reader Install - Universal Concepts document using the C-5101 Spade Taps provided.

  2. Connect the C-5210 Power Adapter Harness to the installed spade taps. Connect the opposite end to the C-5602 Power Converter.

  3. Connect the C-5500 Power Extension Harness to the appropriate connector on the C-5602 Power Converter. The remaining cable end connects to the FasCard reader.

Connect Coin Sense Harness

 I-S0012

Part #: C-5343

Desc 1: Coin Sense Harness (SA)

Desc 2: ADC Phase 5

   Qty: 1

  1. Disconnect the Coin Drop from the Machine Control Assembly.

  2. Connect the C-5343 Coin Sense Harness to the harness connected to the Coin Drop.

Connect Machine Interface Harness

 I-T0056

Part #: C-5344

Desc 1: Machine Start Harness

Desc 2: ADC Phase 5

   Qty: 1

  1. Connect the C-5344 Machine Start Harness to the Coin 1 connection on the Machine Control Assembly.

Extras

 I-X0006

Part #: C-5344

Desc 1: Machine Start Harness

Desc 2: ADC Phase 5

   Qty: 1

Part #: C-6348

Desc 1: Coin Sense Harness (SA)

Desc 2: ADC Phase 5

   Qty: 1

Part #: C-6400

Desc 1: Stack Add On Board - SLV

Desc 2: Pulse / SingleVend

   Qty: 1

  1. Run C-5344 Machine Start Harness and C-6348 Coin Sense Harness to the second Machine Control Assembly.

  2. Connect C-5344 Machine Start Harness to the Coin 1 connection and the C-6348 Coin Sense Harness to the coin drop for the second Machine Control Assembly.

  3. Connect the C-6400 Stack Add-on Board to port 5 (Serial Connection Port) on the F2 reader.

    1. Connect the Machine Start Harness connected to the upper pocket Machine Control Assembly to Port 2 on the reader.

    2. Connect the Machine Start Harness connected to the lower pocket Machine Control Assembly to the Stack Add-on Board.

  4. Connect the Coin Sense Harness connected to the upper pocket Coin Drop to port 3 (Coin 1 Sense Harness Connection Port) on the F2 reader.

  5. Connect the Coin Sense Harness connected to the lower pocket Coin Drop to port 4 (Coin 2 Sense Harness Connection Port) on the F2 reader.

Connect and Mount Reader

 LaundryCard Reader (C-0100, C-0101, C-0102, C-0103)

  1. Feed remaining harness ends through mounting bracket.

  2. For serial setups:

    1. Connect the free end of the Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.

    2. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  3. For coin pulse setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the the Cat5 cables running to and from the adjacent machines to ports labeled 3 (Line Connection Ports) as shown in the image above.

  5. Secure the LaundryCard reader to the bracketry using included hardware.

 LaundryCard L2 Reader (C-0103-L2)

L2_Port_Guide.png
  1. Feed remaining harness ends through mounting bracket.

  2. For serial setups:

    1. Connect the free end of the Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.

    2. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  3. For coin pulse setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the free end of the Power Harness to port 1.

  5. Secure the L2 reader to base as described in FasCard F2/F3 Reader Installation Guide - Front Mount.

 F1 Reader (C-5001)

  1. Feed remaining harness ends through the mounting hole as described in the F1 Reader Mounting Guide.

  2. Connect the free end of the Machine Start Harness to port 1 (Serial Connection Port) as shown in the image above.

  3. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the free end of the Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.

  5. Connect the free end of the Power Extension Harness to port 4 (Power Harness Connection Port) as shown in the image above.

  6. Secure the FasCard reader to base as described in the F1 Reader Mounting Guide.

 F2/FLEX Reader (C-5401, C-5402, C-5402E)

  1. Feed remaining harness ends through the mounting hole as described in FasCard F2/F3 Reader Installation Guide - Front Mount.

  2. For Serial Setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

    2. Connect the free end of the Machine Start Harness to port 5 (Serial Connection Port) as shown in the image above.

  3. For Pulse Setups:

    1. Connect the free end of the Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.

  4. Connect the free end of the Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.

    1. For dual coin drop setups connect the secondary Coin Sense Harness to port 4 (Coin Sense Harness Connection Port) as shown in the image above.

  5. Connect the free end of the Power Harness to port 1.

  6. Secure the FasCard reader to base as described in FasCard F2/F3 Reader Installation Guide - Front Mount.

 F3 Reader (C-5520, C-5520E)

TODO

  • No labels