Skip to end of banner
Go to start of banner

0831 Reader Install Guide

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Warning!

This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses.

It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.

Overview

Equipment Details

Type: Tumble Dryer (Stack)
Manufacturer: Alliance
Make: [VARIES]
Model Length: 15

Associated Models


JT0300DFGEC3456
JT0300DFGECW015
JT0300DRGEC0111
JT0300DRGECL001
JT0300DRGECN001
JT0300DRGECN004
JT0300DRGECN032
JT0300DRGECW001
JT0300DRGECW003
JT0300DRGEXW001
JT0300DRGEYW005
ST0300DFGECL008
ST0300DRGEC1234
ST0300DRGECC001
ST0300DRGECL001
ST0300DRGECLO00
ST0300DRGECW001
ST0300DRGEP1234
ST0300DRGEYW005
ST0300DRGZCN001
ST0300DRGZCW001
ST0300DRGZCW010
ST0300DRGZCW011
ST0300DRGZCWOO1
ST0300DRGZRL002
ST0300DRGZRW001

Recommended Tools and Supplies

  • Drill

  • 1 1/8" Tungsten Carbide Tipped Hole Cutter

  • Cutting Oil

  • 9/64" Drill Bit

  • Center Punch

  • Hammer

  • Fine Point Permanent Marker

  • Pliers

  • Tape Measure

Installation

Install Mounting Hardware

Connect Power

Connect Coin Sense Harness

 I-S0027

Part #: C-6250

Desc 1: Coin Sense Harness

Desc 2: F2

   Qty: 1

  1. Disconnect the Coin Drop from the Machine Control Assembly.

  2. Connect the C-6250 Coin Sense Harness to the harness connected to the Coin Drop.

Connect Machine Interface Harness

 I-T0049

Part #: C-5300-NC

Desc 1: Machine Start Harness

Desc 2: Aliiance - Normally Closed

   Qty: 1

  1. Connect the C-5300-NC Machine Start Harness to the Coin 1 harness connection.

Extras

 I-X0003

Part #: C-5300-NC-144

Desc 1: Machine Start Harness

Desc 2: 144" Alliance

   Qty: 1

Part #: C-6250-144

Desc 1: Coin Sense Harness

Desc 2: 144" length

   Qty: 1

Part #: C-6400

Desc 1: Stack Add On Board - SLV

Desc 2: Pulse / SingleVend

   Qty: 1

  1. Run C-5300-NC-144 Machine Start Harness and C-6250-144 Coin Sense Harness to the second Machine Control Assembly.

  2. Connect C-5300-NC-144 Machine Start Harness to the Coin 1 connection and the C-6250-144 Coin Sense Harness to the Coin Drop on the second Machine Control Assembly.

  3. Connect the C-6400 Stack Add-on Board to port 5 (Serial Connection Port) on the F2 reader.

    1. Connect the Machine Start Harness connected to the upper pocket Machine Control Assembly to Port 2 on the FasCard Reader.

    2. Connect the Machine Start Harness connected to the lower pocket Machine Control Assembly to Stack Add-on Board.

  4. Connect the Coin Sense Harness connected to the upper pocket Coin Drop to port 3 (Coin 1 Sense Harness Connection Port) on the F2 reader.

  5. Connect the Coin Sense Harness connected to the lower pocket Coin Drop to port 4 (Coin 2 Sense Harness Connection Port) on the F2 reader.

 I-X0028

Part #: C-5300-NC-144

Desc 1: Machine Start Harness

Desc 2: 144" Alliance

   Qty: 1

Part #: C-6250-144

Desc 1: Coin Sense Harness

Desc 2: 144" length

   Qty: 1

Part #: C-6410

Desc 1: F3, SLV Stack Add On Dongle

Desc 2: Pulse / SingleVend

   Qty: 1

The following steps assume the start and coin sense harnesses are already connected to the upper pocket control.

  1. Locate area to mount C-6410 Pulse Stack Add-On Board.

    1. Must be close enough to reader mounting location to connect the harness to.

    2. Must be on a surface that does not received direct exposure from any heating elements (If applicable.)

  2. Clean mounting location to remove any dust and residue if needed.

  3. Remove the sticker from the back of the C-6410 Pulse Stack Add-On Board to expose the adhesive and apply to the mounting location.

  4. Connect the white, 6-pin connector from the C-5300-NC-144 Machine Start Harness to the J1 connection on the C-6410 Pulse Stack Add-On Board.

  5. Connect the white, 3-pin connector from the C-5300-NC-144 to the Coin 1 connection on the lower pocket's Machine Control Assembly.

  6. Connect the the green, 3-pin connector from the C-6250-144 Coin Sense Harness to the lower pocket's Coin Drop.

Connect and Mount Reader

CCI Software Configuration

Machine ControlPulseSerial
EDCSingleVend (Relay) / 80ms*NOT SUPPORTED*
NetMasterSingleVend (Relay) / 80ms*NOT SUPPORTED*
Nonmetered*NOT SUPPORTED**NOT SUPPORTED*
Rotary Coin Drop*NOT SUPPORTED**NOT SUPPORTED*

  • No labels