Skip to end of banner
Go to start of banner

_974

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

 I-X0017

Part #: C-5313

Desc 1: Terminal Block

Desc 2: for Laundrylux TD Dryers

   Qty: 1

Part #: C-5356-144

Desc 1: Machine Start Harness

Desc 2: TD Pulse

   Qty: 1

Part #: C-6400

Desc 1: Stack Add On Board - SLV

Desc 2: Pulse / SingleVend

   Qty: 1

Part #: C-0941

Desc 1: Vault Cover

Desc 2: 3-7/8" x 3-1/2"

   Qty: 1

Part #: C-0907

Desc 1: Drop Cover

Desc 2: Wascomat TD 3030

   Qty: 1

Part #: C-1062

Desc 1: Nut

Desc 2: 4-40 - Kep

   Qty: 4

Part #: C-0136

Desc 1: Screw

Desc 2: 4-40 1/2" pan head zinc

   Qty: 4

The following steps assume a start harness is already connected to the upper pocket control.

  1. Run the C-5356-144 Machine Start Harness to the lower pocket Machine Control Assembly.

  2. Connect C-5356-144 Machine Start Harness to the Coin 1 connection on the lower pocket Machine Control Assembly.

  3. Connect the C-6400 Stack Add-on Board to port 5 (Serial Connection Port) on the card reader.

  4. Attach the C-5313 Terminal Block to the Machine Control Assembly for the lower pocket.

  5. Connect the C-5356-144 Machine Start Harness to Positions 2 and 3 on the C-5313 Terminal Block.

  6. Connect the white, 6-pin connector from the C-5356-144 Machine Start Harness to the J1 connection on the C-6400 Pulse Stack Add-On Board.

  7. Insert the C-0941 Vault Cover into the coin vault for the lower pocket’s control.

  8. Install the C-0907 Coin Drop Cover using the (4) C-0136 4-40 1/2” Pan Screws and (4) C-1062 4-40 Kep Nuts to secure in place.

  • No labels