_919
- Chris Kite
Part #: C-5027
Desc 1: Label
Desc 2: Credit Card Logo
Qty: 1
Part #: C-0133
Desc 1: Standoff
Desc 2: 8-32" x 1-1/2" - Hex
Qty: 2
Part #: C-0925A
Desc 1: Mounting Bracket
Desc 2: For Coin Vault Mounting
Qty: 1
Part #: C-0925B
Desc 1: Mounting Bracket
Desc 2: For Coin Vault Mounting
Qty: 1
Part #: C-0964
Desc 1: Drop Cover
Desc 2: IPSO - Square
Qty: 1
Part #: C-1044N
Desc 1: Nut
Desc 2: M3 - Kep
Qty: 4
Part #: C-5751
Desc 1: Screw
Desc 2: 8-32 x 2-1/2" - Flat
Qty: 2
Remove the coin drop and coin box.
Insert the C-0964 Coin Drop Cover into the coin drop opening and secure using the (4) C-1044N M3 Keps Nuts.
Insert the C-0925A Vault Mounting Bracket into the coin vault so that the threaded stud are on the bottom and the flat face is pointed outwards from the vault.
Attach the (2) C-0133 8-32 x 1-1/2" Standoffs to the threaded studs on the C-0925A Vault Mounting Bracket.
Do not continue with the remaining steps until after installing the power and start harnesses and running them through the machine's coin vault opening and then through the openings in the C-0925A and C-0925B Vault Mounting Brackets.
Connect both the power and start harnesses to the card reader.
Place the C-0925B Vault Mounting Bracket over the coin vault, so the holes line up with the threaded studs on C-0925A and the guides line up with the edges of the machine's coin vault opening.
Insert the (2) C-5751 8-32 x 2-1/2" Phillips Machine Screws in the mounting holes of the card reader and then through the holes in the C-0925B Vault Mounting Bracket.
Attach the card reader and C-0925B Vault Mounting Bracket to the C-0925A Vault Mounting Bracket using the (2) C-5751 8-32 x 2-1/2" Phillips Machine Screws.
Optional: Apply the C-5027 Label on or near the card reader for any accepted credit card issuers.